12~40.5kV配電機器と蓄電用パワーエレクトロニクスに特化。トポロジー選定から熱解析、形式試験まで自社で実施します。
From requirements to volume production · full traceability
6 stages / 106-day standard cycle
Customer site survey · technical agreement review
8 daysTopology selection · 3D layout · thermal simulation
14 daysPilot-line prototypes · assembly process validation
21 daysThermal cycling · salt spray · EMC · short-circuit withstand
18 daysField installation · data reporting back
45 daysProcess freeze · supply chain sourcing · volume production
—5 series / 38 models in volume production
Data syncs to the OA product master data
| Model | Product name | Rated parameters | Efficiency / accuracy | Ingress protection | Certification |
|---|---|---|---|---|---|
| CLC-RM-12 | Smart ring main unit | 12 kV | 98.6% | IP67 | KEMA / CQC |
| CLC-DT-2000 | Dry-type transformer | 2000 kVA | 99.1% | IP54 | National Transformer Quality Testing Centre |
| CLC-PCS-630 | Storage converter | 630 kW | 98.9% | IP65 | CGC / TÜV |
| CLC-SW-40 | Integrated primary-secondary circuit breaker | 40.5 kV | — | IP67 | Type tests at the electric power research institute |
| CLC-ED-480 | Liquid-cooled ultra-fast charger | 480 kW | 96.2% | IP55 | CE / GB |
CNAS-accredited laboratory · reports recognised worldwide
4 categories, 27 tests
3 climatic chambers · 15 °C/min ramp
2,000 h neutral salt spray with no base-metal corrosion
3 m anechoic chamber · emissions and immunity
High-current test station · full dynamic and thermal stability
AMap Open Platform · GCJ-02 · redundant with Baidu Maps
6 nodes
言語版 6
4 items
After you submit your requirements the system creates a lead and pushes it to the group OA; the institute customer engineering team responds within 2 hours with a preliminary selection and simulation report.